Henry Schein Exhibition Stand 2015

Size of Stand: 167 SQM Challenge To deliver not only the largest stand of the show, but to build and deliver in a 2 week time frame. Solution One of the largest stands we have delivered across 2 adjacent Exhibition spaces with one double decker stand for corporate and a facing stand for products, with [...]

Barons Quay Exhibition Stand

Size of Stand: 27 sqm Description: Barons Quay Exhibition Stand at Gmex Manchester 2015 Designer: Designed and partnered with www.designshapesbusiness.com On Site: Full installation on site was completed in less than two days, leaving the client plenty of time to dress the stand in preparation for the opening of the show. The client had a [...]

Texas Tourism

Size of Stand: 70 sqm Challenge Build a stand for the Texas Tourism Board incorporating numerous partner areas. Solution A large island site with central store area with full working kitchen, 3 shared meeting areas and 8 partner booths. Large scale backlit graphics and A.V. Displays. Result Due to it being a fairly complex build this [...]

Momentum – Exhibition Stand

Size of Stand: 40.5 sqm Description: London Exhibition - momentum, Specialist team and individual expertise to deliver fully integrated instore marketing solutions. On Site: Full installation on site was completed in less than two days, leaving the client plenty of time to dress the stand in preparation for the opening of the show. The client had a [...]

Roof Maker Exhibition Stand, HB&R Show

Size of Stand: 60 sqm Budget:  10k - £14k Description: We were approached by the owner of Roof Maker to design and build a stand for the Home Building and Renovations Show at the NEC Birmingham. They wanted a fresh design to showcase their roof lights for flat roofs. Our design team came up with [...]

Avery Dennison Exhibition Stand

Size of Stand: 24 sqm Description: London Exhibition - Avery Dennison, showcasing there services.. From apparel branding to food and beverage packaging, building graphics and traffic safety signs. On Site: Full installation on site was completed in less than two days, leaving the client plenty of time to dress the stand in preparation for the [...]